Sec. 4b-51. (Formerly Sec. 4-131). Alterations, repairs or additions to real assets. Selection of consultants for certain projects. (a) The Commissioner of Administrative Services shall have charge and supervision of the remodeling, alteration, repair or enlargement of any real asset, except any dam, flood or erosion control system, highway, bridge or any mass transit, marine or aviation transportation facility, a facility of the Connecticut Marketing Authority, an asset of the Department of Agriculture program established pursuant to section 26-237a, or any building under the supervision and control of the Joint Committee on Legislative Management, involving an expenditure in excess of one million dollars, and except that: (1) The University of Connecticut shall have charge and supervision of the remodeling, alteration, repair, construction or enlargement of any project, as defined in subdivision (16) of section 10a-109c, notwithstanding the amount of the expenditure involved, and (2) (A) until June 30, 2028, (i) the Judicial Branch may have charge and supervision of the remodeling, alteration, repair, construction or enlargement of any real asset involving an expenditure of not more than three million dollars, (ii) each constituent unit of the state system of higher education may have charge and supervision of the remodeling, alteration, repair, construction or enlargement of any real asset involving an expenditure of not more than three million dollars, and (iii) the Military Department may have charge and supervision of the remodeling, alteration, repair, construction or enlargement of any real asset involving an expenditure of not more than three million dollars; and (B) on and after July 1, 2028, the maximum dollar amounts listed in subparagraphs (A)(i) to (A)(iii), inclusive, of this subdivision for which the Judicial Branch, each such constituent unit and the Military Department shall have charge and supervision of the remodeling, alteration, repair, construction or enlargement of real assets shall be adjusted in accordance with the provisions of subsection (b) of this section. In any decision to remodel, alter, repair or enlarge any real asset, the commissioner shall consider the capability of the real asset to facilitate recycling programs.
(b) Not later than July 1, 2028, and annually thereafter, the Commissioner of Administrative Services shall (1) adjust the maximum dollar amounts listed in subparagraphs (A)(i) to (A)(iii), inclusive, of subdivision (2) of subsection (a) of this section by the percentage change in the Producer Price Index by Commodity: Construction (Partial) (WPU80), not seasonally adjusted, or its successor index, as calculated by the United States Department of Labor, over the preceding calendar year, rounded to the nearest multiple of one hundred dollars; and (2) post such adjusted dollar amounts on the Internet web site of the Department of Administrative Services.
(c) No officer, department, institution, board, commission or council of the state government, except the Commissioner of Administrative Services, the Commissioner of Transportation, the Connecticut Marketing Authority, the Department of Agriculture for purposes of the program established pursuant to section 26-237a, the Joint Committee on Legislative Management, the Judicial Branch, a constituent unit of the state system of higher education or the Military Department as authorized in subsection (a) of this section, shall, unless otherwise specifically authorized by law, make or contract for the making of any alteration, repair or addition to any real asset involving an expenditure of more than one million dollars.
(d) The plans necessary for any such remodeling, alteration, repair or enlargement of any state humane institution, as defined in section 17b-222, shall be subject to the approval of the administrative head of such humane institution.
(e) (1) Notwithstanding any provision of the general statutes, the Commissioner of Administrative Services may select consultants to be on a list established for the purpose of providing any consultant services. Such list shall be established as provided in sections 4b-56 and 4b-57. The commissioner may enter into a contract with any consultant on such list to perform a range of consultant services or to perform a range of tasks pursuant to a task letter detailing services to be performed under such contract.
(2) Notwithstanding any provision of the general statutes, the Commissioner of Administrative Services may (A) compile a list of architects, professional engineers and construction administrators for the limited purpose of providing consultant services for a particular program involving various projects for the construction of new buildings or renovations to existing buildings where such buildings are under the operation and control of either the Military Department or the Department of Energy and Environmental Protection, and (B) enter into a contract with any architect, professional engineer or construction administrator on such list for such limited purpose, except that the Adjutant General may perform the functions described in subparagraphs (A) and (B) of this subdivision for any such building under the operation and control of the Military Department.
(3) As used in this subsection, “consultant” means “consultant” as defined in section 4b-55, “consultant services” means “consultant services” as defined in section 4b-55, and “program” means multiple projects involving the planning, design, construction, repair, improvement or expansion of specified buildings, facilities or site improvements, wherein the work (A) will be of a repetitive nature, (B) will share a common funding source that imposes particular requirements, or (C) would be significantly facilitated if completed by the same design professional or construction administrator.
(f) Costs for projects authorized under subsection (c) of this section shall be charged to the bond fund account for the project for which such costs are incurred. The Department of Administrative Services shall develop procedures for expediting the administration of projects for alterations, repairs or additions authorized under said subsection.
(g) Any state agency proposing to remodel, alter or enlarge any real asset shall submit a statement to the commissioner demonstrating the capability of the real asset to facilitate recycling programs.
(1949 Rev., S. 203; March, 1950, S. 1899d; 1957, P.A. 150, S. 2; 457, S. 2; P.A. 73-488; P.A. 75-326; 75-365, S. 1; P.A. 77-614, S. 73, 610; P.A. 81-421, S. 2, 9; P.A. 82-114, S. 1, 2; 82-369, S. 17, 28; 82-438, S. 3, 6; P.A. 83-487, S. 23, 33; P.A. 84-48, S. 9, 17; P.A. 85-567, S. 1, 6; P.A. 87-496, S. 32, 110; 87-529, S. 1; P.A. 88-117, S. 3, 5; 88-231, S. 3; 88-291, S. 3, 6; P.A. 91-200, S. 2, 3; 91-230, S. 8, 17; P.A. 93-201, S. 4, 24; P.A. 95-230, S. 35, 45; P.A. 97-293, S. 19, 26; P.A. 98-235, S. 5; P.A. 99-75, S. 4; P.A. 01-172, S. 3; June 30 Sp. Sess. P.A. 03-6, S. 146(f); P.A. 04-189, S. 1; P.A. 07-213, S. 17; Sept. Sp. Sess. P.A. 09-7, S. 67; P.A. 11-51, S. 90; P.A. 13-247, S. 200; P.A. 14-188, S. 7; P.A. 16-110, S. 1; P.A. 22-26, S. 1; P.A. 23-205, S. 105.)
History: P.A. 73-488 gave commissioner of transportation power to make or contract for real estate expenditures; P.A. 75-326 gave heads of humane institutions authority to approve or disapprove plans for changes to institutions under their control; P.A. 75-365 raised expenditures amount to $50,000, and required public works commissioner's approval of all contracts; P.A. 77-614 replaced public works commissioner with commissioner of administrative services; P.A. 81-421 excluded the supervision of the alteration of mass transit, marine or aviation transportation facilities from the duties of the commissioner; P.A. 82-114 increased amount from $50,000 to $100,000; P.A. 82-369 also increased the amount of expenditure involved from $50,000 or more to $100,000 or more and added provision that amount of expenditure involved in such an alteration, repair or addition made or contracted for by any such officer, department, institution, board, commission or council, may, with prior approval of said commissioner, exceed $100,000 up to a maximum of $250,000; P.A. 82-438 amended section to provide that commissioner of administrative services does not have charge and supervision of remodeling, alteration, repair or enlargement of state capitol building and to authorize legislative management committee to make or contract for alterations, repairs or additions to the capitol; P.A. 83-487 added exception for Connecticut marketing authority and its facilities; P.A. 84-48 excepted any building under the supervision and control of the joint committee on legislative management, where previously exception was for state capitol building; P.A. 85-567 divided section into Subsecs., amended Subsec. (a) to permit departments and institutions to have charge and supervision over and to contract for alterations, repairs and additions involving expenditures of up to $250,000, where previously the limit was $100,000 and added a Subsec. (d) re selection of architects and engineers, maximum fees for technical services and expedited project administration; P.A. 87-496 replaced commissioner and department of administrative services with commissioner and department of public works; P.A. 87-529 amended Subsecs. (a) and (b) to provide that each constituent unit of the state system of higher education have charge and supervision of the remodeling, alteration, repair or enlargement of any real asset involving an expenditure of not more than $500,000; P.A. 88-117 added an exception to the fee limit in Subsec. (d) for projects of constituent units and made a technical change in Subsec. (e); P.A. 88-231 amended Subsec. (a) by requiring commissioner to consider capabilities of real assets to facilitate recycling programs and added Subsec. (e) requiring statements by agencies proposing to remodel, alter or enlarge real assets demonstrating the capability of such real assets to facilitate recycling; P.A. 88-291 amended Subsecs. (a) and (b) by adding the exception for the department of agriculture program established pursuant to Sec. 26-237a; Sec. 4-131 transferred to Sec. 4b-51 in 1989; P.A. 91-200 amended Subsec. (a) to exclude from commissioner's authority the control of any “dam, flood or erosion control system”; P.A. 91-230 in Subsec. (a) added “construction” and changed $500,000 to $1,000,000 in the exception concerning the constituent units of the state system of higher education and in Subsec. (d) changed $50,000 to $150,000; P.A. 93-201 amended Subsec. (a) to increase the expenditure limit for a constituent unit from $1,000,000 to $2,000,000 and amended Subsec. (d) to increase the fee limit for projects of a constituent unit from $150,000 to $300,000, effective July 1, 1993; P.A. 95-230 amended Subsec. (a) to add exception for The University of Connecticut, effective June 7, 1995; P.A. 97-293 made a technical change in Subsec. (a), effective July 1, 1997; P.A. 98-235 amended Subsec. (d) by substituting “consultants” for “architects and engineers”, “consultant services” for “architectural and engineering technical services” and $50,000 for $25,000 and adding the definitions of “consultant” and “consultant services”; P.A. 99-75 substituted $500,000 for $250,000 in Subsecs. (a) and (b); P.A. 01-172 amended Subsec. (d) to designate existing provisions as Subdiv. (1), making a technical change therein, and add Subdiv. (2) re applications and advertisements for consultants; June 30 Sp. Sess. P.A. 03-6 replaced Department of Agriculture with Department of Agriculture and Consumer Protection, effective July 1, 2004; P.A. 04-189 repealed Sec. 146 of June 30 Sp. Sess. P.A. 03-6, thereby reversing the merger of the Departments of Agriculture and Consumer Protection, effective June 1, 2004; P.A. 07-213 amended Subsec. (d) to authorize commissioner to select consultants in accordance with Secs. 4b-56 and 4b-57 and enter into a contract with any such consultant to perform a range of consultant services or tasks, make technical changes and delete former Subdiv. (2) re application process for inclusion on consultant list, effective July 1, 2007; Sept. Sp. Sess. P.A. 09-7 amended Subsec. (a) to add Subdiv. (1) re Judicial Branch supervision and insert Subdiv. designators (2) and (3) and amended Subsec. (b) to insert reference to Judicial Branch, effective October 5, 2009; pursuant to P.A. 11-51, “Commissioner of Public Works” and “Department of Public Works” were changed editorially by the Revisors to “Commissioner of Construction Services” and “Department of Construction Services”, respectively, effective July 1, 2011; pursuant to P.A. 13-247, “Commissioner of Construction Services” and “Department of Construction Services” were changed editorially by the Revisors to “Commissioner of Administrative Services” and “Department of Administrative Services”, respectively, effective July 1, 2013; P.A. 14-188 amended Subsec. (d) to designate provisions re consultant selection as Subdiv. (1), to insert Subdiv. (2) re contracts with architects, professional engineers and construction administrators, to designate definitions as Subdiv. (3) and to add definition of “program” therein, effective July 1, 2014; P.A. 16-110 amended Subsec. (a) to add Subdiv. (4) re Military Department charge and supervision, amended Subsec. (b) to add “or the Military Department” and amended Subsec. (d)(2)(B) to add provision re exception permitting Adjutant General to perform certain functions, effective June 3, 2016; P.A. 22-26 amended Subsec. (a)(1) to increase the expenditure limit for the Judicial Branch from $1,250,000 to $2,000,000, effective May 10, 2022; P.A. 23-205 amended Subsec. (a) by increasing expenditure amount of Joint Committee on Legislative Management from $500,000 to $1,000,000, designating existing provisions re The University of Connecticut as Subdiv. (1) instead of Subdiv. (3), redesignating existing Subdivs. (1), (2) and (4) as Subdiv. (2)(A)(i) to (iii) and amending same to increase expenditure amounts from $2,000,000 to $3,000,000, adding Subdiv. (2)(B) re requirement for adjustment of maximum dollar amounts, added new Subsec. (b) re method and posting of adjustment of maximum dollar amounts, redesignated existing Subsec. (b) as Subsec. (c) and amended same to increase amount from $500,000 to $1,000,000, redesignated existing Subsecs. (c) to (f) as Subsecs. (d) to (g) and made conforming changes, effective July 1, 2023.
(Return to Chapter Table of Contents) |
(Return to List of Chapters) |
(Return to List of Titles) |
Sec. 4b-52. (Formerly Sec. 4-132). Repairs or changes to state premises. Annual adjustment of amounts. Exception for emergency conditions. Renegotiation of leases. (a)(1) Except as provided in subdivision (2) of subsection (b) of this section, no repairs, alterations or additions involving expense to the state of one million dollars or less or, in the case of repairs, alterations or additions to a building rented or occupied by (A) the Judicial Branch, three million dollars or less or (B) a constituent unit of the state system of higher education, three million dollars or less, shall be made to any state building or premises occupied by any state officer, department, institution, board, commission or council of the state government and no contract for any construction, repairs, alteration or addition shall be entered into without the prior approval of the Commissioner of Administrative Services, except repairs, alterations or additions to a building under the supervision and control of the Joint Committee on Legislative Management or the Military Department and repairs, alterations or additions to a building under the supervision of The University of Connecticut. Repairs, alterations or additions which are made pursuant to such approval of the Commissioner of Administrative Services shall conform to all guidelines and procedures established by the Department of Administrative Services for agency-administered projects. (2) Notwithstanding the provisions of subdivision (1) of this subsection, repairs, alterations or additions involving expense to the state of five hundred thousand dollars or less may be made to any state building or premises under the supervision of the Office of the Chief Court Administrator or a constituent unit of the state system of higher education, under the terms of section 4b-11, and any contract for any such construction, repairs or alteration may be entered into by the Office of the Chief Court Administrator or a constituent unit of the state system of higher education without the approval of the Commissioner of Administrative Services.
(b) (1) Except as provided in this section, no repairs, alterations or additions involving an expense to the state of more than one million dollars or, in the case of any repair, alteration or addition administered by the Department of Administrative Services, more than one million five hundred thousand dollars, shall be made to any state building or premises occupied by any state officer, department, institution, board, commission or council of the state government, nor shall any contract for any construction, repairs, alteration or addition be entered into, until the Commissioner of Administrative Services or, in the case of the construction of or repairs, alterations or additions to a building under the supervision and control of the Joint Committee on Legislative Management of the General Assembly, said joint committee or, in the case of the construction of or repairs, alterations or additions to a building involving expenditures (A) in excess of one million dollars but not more than three million dollars under the supervision and control of the Judicial Branch, said Judicial Branch, (B) in excess of one million dollars but not more than three million dollars under the supervision and control of one of the constituent units of higher education, such constituent unit, or (C) in excess of one million dollars but not more than three million dollars under the supervision and control of the Military Department, said department, has invited bids thereon and awarded a contract thereon, in accordance with the provisions of sections 4b-91 to 4b-96, inclusive. The Commissioner of Administrative Services, with the approval of the authority having the supervision of state employees or the custody of inmates of state institutions, without the necessity of bids, may employ such employees or inmates and purchase or furnish the necessary materials for the construction, erection, alteration, repair or enlargement of any such state building or premises occupied by any state officer, department, institution, board, commission or council of the state government.
(2) Not later than July 1, 2028, and annually thereafter, the Commissioner of Administrative Services shall (A) adjust the maximum dollar amounts listed in subparagraphs (A) and (B) of subdivision (1) of subsection (a) of this section and subparagraphs (A) to (C), inclusive, of subdivision (1) of this subsection by the percentage change in the Producer Price Index by Commodity: Construction (Partial) (WPU80), not seasonally adjusted, or its successor index, as calculated by the United States Department of Labor, over the preceding calendar year, rounded to the nearest multiple of one hundred dollars; and (B) post such adjusted dollar amounts on the Internet web site of the Department of Administrative Services.
(c) Whenever the Commissioner of Administrative Services declares that an emergency condition exists at any state facility, other than a building under the supervision and control of the Joint Committee on Legislative Management, and that the condition would adversely affect public safety or the proper conduct of essential state government operations, or said joint committee declares that such an emergency exists at a building under its supervision and control, the commissioner or the joint committee may employ such assistance as may be required to restore facilities under their control and management, or the commissioner may so act upon the request of a state agency, to restore facilities under the control and management of such agency, without inviting bids as required in subsection (b) of this section. The commissioner shall take no action requiring the expenditure of more than one million five hundred thousand dollars to restore any facility under this subsection (1) without the written consent of the Governor, and (2) until the commissioner has certified to the Joint Committee on Legislative Management that the project is of such an emergency nature that an exception to subsection (b) of this section is required. Such certification shall include input from all affected agencies, detail the need for the exception and include any relevant documentation. The provisions of this subsection shall not apply if any person is obligated under the terms of an existing contract with the state to render such assistance. The annual report of the commissioner shall include a detailed statement of all expenditures made under this subsection.
(d) The Commissioner of Administrative Services may, during the term of a lease of a building or premises occupied by any state offices, department, institution, board, commission or council of the state government, (1) renegotiate the lease in order to enable the lessor to make necessary alterations or additions up to a maximum amount of five hundred thousand dollars, subject to the approval of the State Properties Review Board, or (2) require that a security audit be conducted for such building or premises and, if necessary, renegotiate the lease in order to enable the lessor to make necessary alterations or additions to bring the building or premises into compliance with the security standards for state agencies established under section 4b-132. Alterations or additions under subdivision (2) of this subsection shall not be subject to the spending limit in subdivision (1) of this subsection, and a renegotiated lease under said subdivision (2) shall be subject to the approval of the State Properties Review Board, provided such approval requirement shall not compromise the security requirements of chapter 60a and this section. The commissioner shall determine the manner of submission, conditions and requirements of bids and awards made for alterations or additions under this subsection. No lease shall be renegotiated under this subsection for a term less than five years. As used in this subsection, “security” and “security audit” have the meanings assigned to such terms in section 4b-130.
(1949 Rev., S. 262; March, 1950, S. 100d; 1957, P.A. 150, S. 1; 457, S. 1; 1969, P.A. 708; P.A. 73-528, S. 11, 12; P.A. 74-246, S. 10, 11; P.A. 75-365, S. 2; P.A. 77-614, S. 73, 610; P.A. 82-285, S. 2, 3; P.A. 83-12, S. 2; 83-199; 83-329; 83-530, S. 1, 3; P.A. 84-48, S. 10, 17; 84-436, S. 5, 12; P.A. 85-225; 85-567, S. 2, 6; P.A. 87-496, S. 34, 110; 87-529, S. 2, 3; P.A. 88-116, S. 1; P.A. 91-230, S. 9, 17; P.A. 92-154, S. 4, 23; P.A. 93-201, S. 5, 24; P.A. 95-230, S. 36, 45; P.A. 96-235, S. 16, 19; P.A. 97-293, S. 13, 26; P.A. 99-75, S. 5; 99-220, S. 8; P.A. 03-215, S. 10; P.A. 05-288, S. 22; Sept. Sp. Sess. P.A. 09-7, S. 68; P.A. 11-51, S. 92; P.A. 13-247, S. 209; P.A. 14-122, S. 6; 14-182, S. 8; 14-188, S. 5; P.A. 16-110, S. 2; P.A. 23-205, S. 106.)
History: 1969 act required award of bid 60 days after bid opening rather than 30 days and provided for negotiation of contract if lowest bid exceeds funds available; P.A. 73-528 put upper limit on expenditures of $500,000, effective January 1, 1974; P.A. 74-246 clarified procedure for negotiation of contract if lowest bid exceeds available funds, specifying that bidders be negotiated with in ascending order of bid amounts; P.A. 75-365 divided section into Subsecs. (a) and (b), required approval of public works commissioner for all work and contracts for work and raised lower limit for expenditures requiring bids to $50,000; P.A. 77-614 replaced public works commissioner with commissioner of administrative services; P.A. 82-285 added Subsec. (c) establishing procedure for making emergency repairs to state facilities without competitive bidding; P.A. 83-12 amended Subsec. (a) by allowing repairs, alterations or additions to the state capitol without the prior approval of the commissioner of administrative services, amended Subsec. (b) by placing responsibility for bids on repairs, alterations or additions to the state capitol with the joint committee on legislative management rather than the department of administrative services and amended Subsec. (c) to provide that the joint committee on legislative management shall have the responsibility of declaring and managing any emergency situations which may arise at the state capitol building; P.A. 83-199 added Subsec. (d) giving the commissioner of administrative services the power to renegotiate the terms of a lease under certain circumstances; P.A. 83-329 added Subsec. (e) permitting expenditures in excess of $500,000 for repairs, alterations or additions to leased properties if leased from a municipality, remaining term is five years or more and properties review board approves; P.A. 83-530 raised limit on expenditures requiring administrative commissioner's approval from $50,000 to $100,000 in Subsec. (a) and made corresponding change in Subsec. (b) re expenditures for which bids must be invited; P.A. 84-48 included references to building under the supervision and control of the joint committee on legislative management, replacing references to state capitol; P.A. 84-436 amended Subsec. (a) to authorize the office of the chief court administrator to contract for and make repairs, alterations or additions costing $50,000 or less to any state building or premises under its supervision without the commissioner's approval, effective July 1, 1985; P.A. 85-225 increased the maximum expenditure amount in Subsec. (c) from $50,000 to $100,000; P.A. 85-567 increased dollar amounts of expenditures for projects which may be undertaken by departments and institutions from $100,000 to $250,000; P.A. 87-496 replaced commissioner of administrative services with commissioner of public works; P.A. 87-529 in Subsec. (a) raised limit on expenditures requiring administrative commissioner's approval from $250,000 to $500,000 in the case of repairs, alterations or additions to a building rented or occupied by a constituent unit of the state system of higher education, and in Subsec. (b) placed responsibility for bids on construction, repairs, alterations or additions to buildings involving expenditures in excess of $250,000 but not more than $500,000 under the supervision and control of a constituent unit with the constituent unit; P.A. 88-116 transferred provision in Subsec. (a) re control and management of property leased or rented by the state or a state entity to Sec. 4-133, amended Subsec. (b) by requiring contract to be awarded “in accordance with the provisions of sections 4-137a to 4-137g, inclusive” in lieu of former procedure and deleted Subsec. (e) re applicability of $500,000 limit in Subsec. (b) on expenditure of funds for repairs, alterations or additions to buildings or premises occupied by the state; Sec. 4-132 transferred to Sec. 4b-52 in 1989; P.A. 91-230 in Subsecs. (a) and (b) changed $500,000 limit to $1,000,000; P.A. 92-154 amended Subsec. (a) to apply provisions of Subdiv. (2) to constituent units of the state system of higher education; P.A. 93-201 amended Subsecs. (a) and (b) to increase the limit for repairs, alterations or additions to a building rented or occupied by a constituent unit from $1,000,000 to $2,000,000, effective July 1, 1993; P.A. 95-230 amended Subsec. (a) to add exception for The University of Connecticut, effective June 7, 1995; P.A. 96-235 amended Subsec. (c) by repealing provision that required damage by fire or other disaster for declaration of emergency condition at state facility or building and substituting $250,000 for $100,000 as expenditure limit without Governor's consent, effective June 6, 1996; P.A. 97-293 amended Subsec. (a)(2) to increase the amount from $50,000 to $100,000, effective July 1, 1997; P.A. 99-75 substituted “five hundred thousand dollars” for “two hundred fifty thousand dollars” in Subsecs. (a), (b) and (c), amended Subsec. (a)(1) by adding provision requiring conformity of certain repairs, alterations or additions to Department of Public Works guidelines and procedures, and amended Subsec. (c) by repealing requirement of Governor's consent for emergency restorations by joint committee exceeding $250,000 and by deleting the joint committee from the annual report requirement; P.A. 99-220 added Subsec. (d)(2) re security audits and alterations or additions to leased buildings for compliance with security standards and defining the terms “security” and “security audit”; P.A. 03-215 amended Subsec. (c) to insert Subdiv. (1) designator and insert provisions re certification to General Assembly re emergency nature of project as Subdiv. (2), effective July 1, 2004; P.A. 05-288 made a technical change in Subsec. (a)(2), effective July 13, 2005; Sept. Sp. Sess. P.A. 09-7 amended Subsec. (a) to add provision re buildings rented or occupied by Judicial Branch in Subdiv. (1) and to substitute “five hundred thousand” for “one hundred thousand” re dollar limit in Subdiv. (2), and amended Subsec. (b) to add provisions re buildings rented or occupied by Judicial Branch or under supervision and control of Judicial Branch, effective October 5, 2009; P.A. 11-51 amended Subsecs. (a) to (c) to change “Commissioner of Public Works” to “Commissioner of Construction Services” and make a conforming change, and amended Subsec. (d) to change “Commissioner of Public Works” to “Commissioner of Administrative Services” and require consultation with Commissioner of Construction Services, effective July 1, 2011; P.A. 13-247 replaced references to Commissioner of Construction Services and Department of Construction Services with references to Commissioner of Administrative Services and Department of Administrative Services, respectively, and made a conforming change, effective July 1, 2013; P.A. 14-122 made a technical change in Subsec. (c), effective June 6, 2014; P.A. 14-182 made a technical change in Subsec. (c), effective June 12, 2014; P.A. 14-188 amended Subsec. (b) to substitute provisions re Department of Administrative Services projects of more than $1,500,000 for provisions re projects by the Judicial Branch of more than $1,250,000 and by the constituent units of more than $2,000,000, amended Subsec. (c) to increase expenditure amount from more than $500,000 to more than $1,500,000 and to make a technical change, and amended Subsec. (d) to make a technical change, effective July 1, 2014; P.A. 16-110 amended Subsec. (a)(1) to add “or the Military Department” and amended Subsec. (b) to add provision re building under supervision and control of Military Department and to make technical changes, effective June 3, 2016; P.A. 23-46 amended Subsec. (a) to increase the limit applicable to the Judicial Branch from $1,250,000 to $2,000,000 effective July 1, 2023; P.A. 23-205 amended Subsecs. (a) and (b) to increase expenditure amounts re state from $500,000 to $1,000,000, expenditure amounts re the Judicial Branch from $1,250,000 to $3,000,000 and expenditure amounts regarding constituent units from $2,000,000 to $3,000,000, amended Subsec. (a)(1) to add an exception re Subsec. (b)(2) and insert Subpara. designators (A) and (B) and amended Subsec. (b) to designate existing provisions as Subdiv. (1) and amended same to add Subpara. designators (A), (B) and (C) and added Subdiv. (2) re annual adjustment and posting of maximum dollar amounts, effective July 1, 2023.
(Return to Chapter Table of Contents) |
(Return to List of Chapters) |
(Return to List of Titles) |
Sec. 4b-55. (Formerly Sec. 4-134a). State Construction Services Selection Panel; Connecticut Health and Education Facilities Authority Construction Services Panel. Definitions. As used in this section, section 4b-1 and sections 4b-56 to 4b-59, inclusive, unless the context clearly requires otherwise:
(1) “Commissioner” means the Commissioner of Administrative Services;
(2) “Consultant” means (A) any architect, professional engineer, landscape architect, land surveyor, accountant, interior designer, environmental professional or construction administrator, who is registered or licensed to practice such person's profession in accordance with the applicable provisions of the general statutes, or (B) any planner or financial specialist;
(3) “Consultant services” includes those professional services rendered by architects, professional engineers, landscape architects, land surveyors, accountants, interior designers, environmental professionals, construction administrators, planners or financial specialists, as well as incidental services that members of these professions and those in their employ are authorized to perform;
(4) “Firm” means any individual, partnership, corporation, joint venture, association or other legal entity (A) authorized by law to practice the profession of architecture, landscape architecture, engineering, land surveying, accounting, interior design, environmental or construction administration, or (B) practicing the profession of planning or financial specialization;
(5) “Priority higher education facility project” means any project which is part of a state program to repair, renovate, enlarge, equip, purchase or construct (A) instructional facilities, (B) academic core facilities, including library, research and laboratory facilities, (C) student residential or related student dining facilities, or (D) utility systems related to such projects, which are or will be operated under the jurisdiction of the board of trustees of any constituent unit of the state system of higher education, except The University of Connecticut provided the project is included in the comprehensive facilities master plan of the constituent unit in the most recent state facility plan of the Office of Policy and Management pursuant to section 4b-23;
(6) “Project” means any state program requiring consultant services if the cost of such services is estimated to exceed seven hundred fifty thousand dollars, adjusted annually on and after July 1, 2024, in accordance with the provisions of section 4b-59a;
(7) “Selection panel” or “panel” means the State Construction Services Selection Panel established pursuant to subsection (a) of section 4b-56 or, in the case of a Connecticut Health and Education Facilities Authority project pursuant to section 10a-186a, means the Connecticut Health and Education Facilities Authority Construction Services Panel established pursuant to subsection (c) of section 4b-56;
(8) “User agency” means the state department or agency requesting the project or the agency for which such project is being undertaken pursuant to law;
(9) “Community court project” means (A) any project to renovate and improve a facility designated for the community court established pursuant to section 51-181c, and (B) the renovation and improvement of other state facilities required for the relocation of any state agency resulting from the placement of the community court;
(10) “Downtown Hartford higher education center project” means a project to develop a higher education center, as defined in subparagraph (B) of subdivision (2) of section 32-600, and as described in subsection (a) of section 32-612, for the regional community-technical college system;
(11) “Correctional facility project” means any project (A) which is part of a state program to repair, renovate, enlarge or construct facilities which are or will be operated by the Department of Correction, and (B) for which there is an immediate need for completion in order to remedy prison and jail overcrowding; and
(12) “Juvenile residential center project” means any project (A) which is part of a state program to repair, renovate, enlarge or construct juvenile residential centers which are or will be operated by the Judicial Department, and (B) for which there is an immediate need for completion in order to remedy overcrowding.
(P.A. 79-450, S. 1, 8; P.A. 82-369, S. 18, 28; P.A. 85-567, S. 3, 6; P.A. 87-496, S. 38, 110; 87-529, S. 4; P.A. 88-117, S. 4, 5; P.A. 89-353, S. 1, 8; P.A. 90-261, S. 1, 19; P.A. 91-230, S. 1, 17; June Sp. Sess. P.A. 91-9, S. 6, 10; P.A. 92-228, S. 4, 9; P.A. 93-201, S. 6, 24; May Sp. Sess. P.A. 94-2, S. 3, 203; P.A. 95-152, S. 1; 95-230, S. 37, 45; P.A. 96-235, S. 5, 19; P.A. 97-293, S. 11, 26; P.A. 98-21, S. 2; 98-59, S. 2, 3; 98-235, S. 4; P.A. 99-26, S. 2, 39; 99-75, S. 6; 99-241, S. 48, 66; P.A. 00-192, S. 15, 102; P.A. 01-26, S. 4; 01-172, S. 2; June Sp. Sess. P.A. 01-7, S. 15, 28; P.A. 03-215, S. 11; P.A. 05-287, S. 49; P.A. 07-213, S. 18; P.A. 11-51, S. 90; P.A. 12-133, S. 10; 12-156, S. 3; P.A. 13-247, S. 200; P.A. 16-81, S. 2; P.A. 18-31, S. 10; P.A. 21-104, S. 2; P.A. 23-205, S. 107.)
History: P.A. 82-369 redefined “project” by increasing the estimated cost of design professional services from $10,000 to $25,000; P.A. 85-567 amended definition of “project”, increasing dollar amount for construction costs from one hundred thousand to $250,000; P.A. 87-496 redefined “commissioner” as public works rather than administrative services commissioner; P.A. 87-529 redefined “project” by increasing dollar amount for construction costs in the case of a constituent unit of the state system of higher education from $250,000 to $500,000; P.A. 88-117 amended Subsec. (e)(1) to provide an exception for constituent units, of the state system of higher education; Sec. 4-134a transferred to Sec. 4b-55 in 1989; P.A. 89-353 added definition of “emergency correctional facility project” and relettered former Subsecs. (d) to (g), inclusive; P.A. 90-261 amended the definition of “emergency correctional facility project” to change the deadline for the commencement of the project from June 30, 1990, to December 31, 1991, and to increase the maximum estimated construction cost from $12,000,000 to $20,000,000; P.A. 91-230 inserted definition of “priority higher education facility project” as Subsec. (f), relettering former Subsecs. accordingly and in Subsec. (g) changed $50,000 to $150,000 in Subdiv. (1), and $500,000 to $1,000,000 in Subdiv. (2); June Sp. Sess. P.A. 91-9 amended Subsec. (d)(2) to substitute December 31, 1993, for December 31, 1991; P.A. 92-228 amended Subsec. (h) to change name of panel from “design professional services selection panel” to “state construction services selection panel”; P.A. 93-201 amended Subsec. (g) defining “project” to increase the limits for a constituent unit from $150,000 to $300,000 for design services and from $1,000,000 to $2,000,000 for construction costs for higher education projects, effective July 1, 1993; May Sp. Sess. P.A. 94-2 added definition of “University of Connecticut library project” and relettered former Subsecs. (f) to (j), inclusive, effective July 1, 1994; P.A. 95-152 amended Subsec. (d)(1) to delete provision that the immediate need for completion of such facility project “has been certified by the advisory commission pursuant to section 18-87f”, reflecting the repeal of said section by the same public act; P.A. 95-230 amended Subsecs. (g) and (h) to add exception for The University of Connecticut, effective June 7, 1995; P.A. 96-235 amended Subsec. (b) by changing defined term from “design professional” to “consultant” and including registered or licensed accountants, interior designers, environmental professionals and construction administrators and any planner, construction manager or financial specialist in such definition, amended Subsec. (c) by changing defined term from “design professional services” to “consultant services” and including services rendered by accountants, interior designers, environmental professionals, construction administrators, planners, construction managers and financial specialists in such definition, amended Subsec. (f) by adding entities authorized by law to practice profession of accounting, interior design, environmental or construction administration or practicing profession of planning, construction management or financial specialization to definition of “firm” and amended Subsec. (h) by substituting “consultant services” for “design professionals”, effective June 6, 1996; P.A. 97-293 redefined “selection panel” or “panel” to include the Connecticut Health and Education Facilities Authority Construction Services Panel, effective July 1, 1997; P.A. 98-21 added Subsec. (k) defining “community court project”; P.A. 98-59 changed effective date of P.A. 98-21 from October 1, 1998, to April 13, 1998; P.A. 98-235 deleted reference to Sec. 4b-23(i) in introductory text and amended Subsec. (h), defining “project”, by substituting $50,000 for $25,000 in Subdiv. (1) and $400,000 for $250,000 in Subdiv. (2); P.A. 99-26 added Subsec. (l), designated by the Revisors as Subsec. (k) defining the “Connecticut Juvenile Training School project” and made a technical change for purposes of gender neutrality, effective May 7, 1999; P.A. 99-75 repealed Subsec. (d) which defined “Emergency correctional facility project”, relettered former Subsecs. (e) to (k), inclusive, accordingly and substituted $500,000 for $400,000 in relettered Subsec. (g), defining “project”; P.A. 99-241 made a technical change in Subsec. (b) for purposes of gender neutrality and added new Subsec. (l) re downtown Hartford higher education center, effective June 28, 1999; P.A. 00-192 added Subsecs. (m) and (n) defining “correctional facility project” and “juvenile detention center project”, effective July 1, 2000; P.A. 01-26 made a technical change in Subsec. (b); P.A. 01-172 amended Subsec. (g) to substitute “and” for “or” between Subdivs. (1) and (2); June Sp. Sess. P.A. 01-7 amended Subsec. (k) to make technical changes and include in the definition of “Connecticut Juvenile Training School” a provision for a separate facility for girls, effective July 1, 2001; P.A. 03-215 redefined “consultant”, “consultant services” and “firm” by deleting references to “construction managers” and “construction management”, effective October 1, 2004; P.A. 05-287 amended Subsec. (i) to redefine “user agency” to include the agency for which the project is being undertaken pursuant to law, effective July 13, 2005; P.A. 07-213 amended Subsec. (g) to redefine “project”, effective July 10, 2007; pursuant to P.A. 11-51, “Commissioner of Public Works” was changed editorially by the Revisors to “Commissioner of Construction Services”, effective July 1, 2011; P.A. 12-133 amended Subsec. (j)(1) to delete “pilot program”; P.A. 12-156 amended Subsec. (f) to delete reference to Sec. 10-4a, effective June 15, 2012; pursuant to P.A. 13-247, “Commissioner of Construction Services” was changed editorially by the Revisors to “Commissioner of Administrative Services”, effective July 1, 2013; P.A. 16-81 redesignated existing Subsecs. (a) to (c) and (e) to (n) as Subdivs. (1) to (13), deleted former Subsec. (d) defining “University of Connecticut library project”, amended redesignated Subdiv. (6) to redefine “project” by changing $300,000 to $500,000 and made technical and conforming changes, effective July 1, 2016; P.A. 18-31 deleted former Subdiv. (10) defining “Connecticut Juvenile Training School project” and redesignated existing Subdivs. (11) to (13) as Subdivs. (10) to (12), effective July 1, 2018; P.A. 21-104 amended Subdiv. (12) to replace “detention” with “residential”, effective January 1, 2022; P.A. 23-205 amended Subdiv. (6) by changing $500,000 to $750,000 and adding provision re annual adjustment, effective July 1, 2023.
(Return to Chapter Table of Contents) |
(Return to List of Chapters) |
(Return to List of Titles) |
Sec. 4b-56. (Formerly Sec. 4-134b). State construction services selection panels, and Connecticut Health and Education Facilities Authority construction services panels, established. Membership. (a) There shall be established within the Department of Administrative Services state construction services selection panels which (1) for projects valued at five million dollars or more, shall consist of five members, four of whom shall be current or retired employees of the Department of Administrative Services appointed by the commissioner and one of whom shall be appointed by the head or acting head of the user agency, and (2) for projects valued at less than five million dollars, shall consist of three members, two of whom shall be current or retired employees of the Department of Administrative Services appointed by the commissioner and one of whom shall be appointed by the head or acting head of the user agency. Each member of a section panel, regardless of the appointing authority, shall serve only for deliberations involving the project for which such member is appointed.
(b) A panel established pursuant to subsection (a), (c) or (e) of this section shall not be deemed to be a board or commission within the meaning of section 4-9a.
(c) There shall be established within the Department of Administrative Services Connecticut Health and Education Facilities Authority construction services panels which shall consist of five members. Three of such members shall be appointed by the Commissioner of Administrative Services, shall serve only for deliberations involving the project for which such members are appointed and shall be current employees of the Department of Administrative Services. The remaining members shall be appointed by the head or acting head of the user agency and shall serve only for deliberations involving the project for which such members are appointed.
(d) The panels established pursuant to subsection (c) of this section shall be the selection panels only for Connecticut Health and Education Facilities Authority projects pursuant to section 10a-89b.
(e) There shall be established, within the Department of Administrative Services, a State Construction Services Selection Panel that shall consist of three members. Such members shall be appointed by the commissioner, shall be current employees of the Department of Administrative Services or any agency for which consultant services may be contracted, and shall serve only for deliberations involving the selection of consultants under subsection (e) of section 4b-51 for which the employees are appointed.
(P.A. 79-450, S. 3, 8; P.A. 87-496, S. 39, 110; P.A. 91-43, S. 2; P.A. 92-228, S. 5, 9; P.A. 96-235, S. 15, 19; P.A. 97-47, S. 49; 97-293, S. 12, 26; P.A. 07-213, S. 15, 19; P.A. 11-51, S. 90; P.A. 13-51, S. 1; 13-247, S. 200; P.A. 23-205, S. 110.)
History: P.A. 87-496 substituted “public works” for “administrative services” department; Sec. 4-134b transferred to Sec. 4b-56 in 1989; P.A. 91-43 amended Subsec. (a) to allow either current or retired employees to be appointed by commissioner to panel; P.A. 92-228 amended Subsec. (a) by changing name of panel from “state design professional services selection panel” to “state construction services selection panel”; P.A. 96-235 amended Subsec. (a) by decreasing membership of panel from six to five and decreasing number of appointments by Commissioner of Public Works from five to four, effective June 6, 1996; P.A. 97-47 rearranged provisions in Subsec. (a); P.A. 97-293 added Subsecs. (c) and (d) re Connecticut Health and Education Facilities Authority Construction Services Panel, effective July 1, 1997; P.A. 07-213 amended Subsec. (a) to establish more than one panel, provide that members appointed by commissioner serve only for deliberations involving the project for which the member is appointed, eliminate one-year term for such members, and remove commissioner's authority to fill vacancies on the panel, made a technical change in Subsec. (b), amended Subsec. (c) to establish more than one panel, provide that members appointed by commissioner serve only for deliberations involving the project for which the member is appointed, eliminate one-year term for such members, and remove commissioner's authority to fill vacancies on the panel, made technical changes in Subsec. (d), and added Subsecs. (e) and (f) re State Construction Services Selection Panel for selection of consultants under Sec. 4b-51(d), effective July 10, 2007; pursuant to P.A. 11-51, “Commissioner of Public Works” and “Department of Public Works” were changed editorially by the Revisors to “Commissioner of Construction Services” and “Department of Construction Services”, respectively, effective July 1, 2011; P.A. 13-51 amended Subsec. (a) to designate existing provisions re members as Subdiv. (1) and amend same to add reference to projects valued at $5,000,000 or more and to add Subdiv. (2) re projects valued at less than $5,000,000, amended Subsec. (b) to add reference to panel established under Subsec. (a), (c) or (e), amended Subsec. (d) to delete provision re not being deemed a board or commission under Sec. 4-9a, amended Subsec. (e) to decrease number of members from 5 to 3, and deleted former Subsec. (f) re not being deemed a board or commission under Sec. 4-9a, effective July 1, 2013; pursuant to P.A. 13-247, “Commissioner of Construction Services” and “Department of Construction Services” were changed editorially by the Revisors to “Commissioner of Administrative Services” and “Department of Administrative Services”, respectively, effective July 1, 2013; P.A. 23-205 amended Subsec. (e) to make a technical change, effective July 1, 2023.
(Return to Chapter Table of Contents) |
(Return to List of Chapters) |
(Return to List of Titles) |
Sec. 4b-57. (Formerly Sec. 4-134c). Consultant services. Invitation of responses. Consideration by selection panel. (a) Whenever consultant services are required by the commissioner in fulfilling the responsibilities under section 4b-1, and in the case of each project, the commissioner shall invite responses from such firms by posting notice on the State Contracting Portal, except that the commissioner may receive consultant services under a contract entered into pursuant to subsection (e) of section 4b-51. The commissioner shall prescribe, by regulations adopted in accordance with chapter 54, the advance notice required for, the manner of submission, and conditions and requirements of, such responses.
(b) In the case of a project, the responses received shall be considered by the selection panel. The panel shall select from among those responding no fewer than three firms, which such panel determines in accordance with criteria established by the commissioner are most qualified to perform the required consultant services. In the case of any project that requires consultant services by an architect or professional engineer, additional criteria to be considered by such panel in selecting a list of the most qualified firms shall include: (1) Such firm's knowledge of this state's building and fire codes, and (2) the geographic location of such firm in relation to the geographic location of the proposed project. The selection panel shall submit a list of the most qualified firms to the commissioner for the commissioner's consideration unless fewer than three responses for a particular project have been received, in which case the panel shall submit the names of all firms who have submitted responses.
(c) In the case of consultants selected under subsection (e) of section 4b-51, the responses received shall be considered by the selection panel. The panel shall select, from among those persons responding, a list of those persons most qualified to perform the consultant services. Knowledge of the state building and fire code and whether the consultant is a micro business, as defined in subsection (c) of section 4a-59, shall be considered in determining a consultant's qualifications.
(P.A. 79-450, S. 4, 8; P.A. 80-483, S. 13, 186; P.A. 96-235, S. 11, 19; P.A. 05-287, S. 29; P.A. 06-196, S. 32; P.A. 07-213, S. 20; P.A. 10-190, S. 1; P.A. 16-81, S. 3; P.A. 23-205, S. 111.)
History: P.A. 80-483 made technical changes; Sec. 4-134c transferred to Sec. 4b-57 in 1989; P.A. 96-235 substituted “consultant” for “design professional”, effective June 6, 1996; P.A. 05-287 amended Subsec. (b) to provide additional criteria to be considered by the panel in the case of a project that requires consultant services by an architect or professional engineer, effective July 13, 2005; P.A. 06-196 made technical changes in Subsec. (b), effective June 7, 2006; P.A. 07-213 amended Subsec. (a) to make a technical change and create exception for consultant services under contract entered into pursuant to Sec. 4b-51(d) and added Subsec. (c) re consultants selected under Sec. 4b-51(d), effective July 10, 2007; P.A. 10-190 amended Subsec. (c) to include consideration of whether consultant is a micro business, effective July 1, 2010; P.A. 16-81 amended Subsec. (a) to replace provision re advertising in newspaper with provision re posting notice on State Contracting Portal, effective July 1, 2016; P.A. 23-205 amended Subsecs. (a) and (c) to make a technical change, effective July 1, 2023.
(Return to Chapter Table of Contents) |
(Return to List of Chapters) |
(Return to List of Titles) |
Sec. 4b-59a. Annual adjustment of threshold cost for certain consultant services to be deemed a project. Not later than July 1, 2024, and annually thereafter, the Commissioner of Administrative Services shall (1) adjust the threshold cost for consultant services for a state program to be deemed a project for the purposes of sections 4b-1 and 4b-55 to 4b-59, inclusive, by the percentage change in the Producer Price Index by Commodity: Construction (Partial) (WPU80), not seasonally adjusted, or its successor index, as calculated by the United States Department of Labor, over the preceding calendar year, rounded to the nearest multiple of one hundred dollars, and (2) post such adjusted threshold cost on the Internet web site of the Department of Administrative Services.
(P.A. 23-205, S. 108.)
History: P.A. 23-205 effective July 1, 2023.
(Return to Chapter Table of Contents) |
(Return to List of Chapters) |
(Return to List of Titles) |
Sec. 4b-91. (Formerly Sec. 4-137a). Process for bidding for public works contracts. Prequalification requirements. Exceptions. (a)(1) As used in this section, “prequalification classification” means the prequalification classifications established by the Commissioner of Administrative Services pursuant to section 4a-100, “public agency” has the same meaning as provided in section 1-200, “awarding authority” means the Department of Administrative Services, except “awarding authority” means (A) the Joint Committee on Legislative Management, in the case of a contract for the construction of or work on a building or other public work under the supervision and control of the joint committee, (B) a constituent unit of the state system of higher education, in the case of a contract for the construction of or work on a building or other public work under the supervision and control of such constituent unit, or (C) the Military Department, in the case of a contract for the construction of or work on a building or other public work under the supervision and control of said department and “community court project”, “downtown Hartford higher education center project”, “correctional facility project”, “juvenile residential center project” and “priority higher education facility project” have the same meanings as provided in section 4b-55.
(2) Except as provided in subdivision (3) of this subsection, every contract for the construction, reconstruction, alteration, remodeling, repair or demolition of any public building or any other public work by the state that is estimated to cost more than one million dollars shall be awarded to the lowest responsible and qualified general bidder who is prequalified pursuant to section 4a-100 on the basis of competitive bids in accordance with the procedures set forth in this chapter, after the awarding authority has invited such bids by posting notice on the State Contracting Portal. The awarding authority shall indicate the prequalification classification required for the contract in such notice.
(3) The requirements set forth in subdivision (2) of this subsection shall not apply to (A) a public highway or bridge project or any other construction project administered by the Department of Transportation, or (B) a contract awarded by the Commissioner of Administrative Services for (i) any public building or other public works project administered by the Department of Administrative Services that is estimated to cost one million five hundred thousand dollars or less, (ii) a community court project, (iii) the downtown Hartford higher education center project, (iv) a correctional facility project, (v) a juvenile residential center project, or (vi) a student residential facility for the Connecticut State University System that is a priority higher education facility project.
(4) Every contract for the construction, reconstruction, alteration, remodeling, repair or demolition of any public building or any other public work by a public agency that is paid for, in whole or in part, with state funds and that is estimated to cost more than one million dollars shall be awarded to a bidder that is prequalified pursuant to section 4a-100 after the public agency has invited such bids by posting notice on the State Contracting Portal, except for (A) a public highway or bridge project or any other construction project administered by the Department of Transportation, or (B) any public building or other public works project administered by the Department of Administrative Services that is estimated to cost one million five hundred thousand dollars or less. The awarding authority or public agency, as the case may be, shall indicate the prequalification classification required for the contract in such notice.
(5) (A) The Commissioner of Administrative Services may select contractors to be on lists established for the purpose of providing contractor services for the construction, reconstruction, alteration, remodeling, repair or demolition of any public building or other public works project administered by the Department of Administrative Services involving an expense to the state of one million five hundred thousand dollars or less. The commissioner shall use the prequalification classifications established pursuant to section 4a-100 to determine the specific categories of services that contractors may perform after being selected in accordance with this subparagraph and subparagraph (B) of this subdivision and awarded a contract in accordance with subparagraph (C) of this subdivision. The commissioner may establish a separate list for projects involving an expense to the state of less than one million dollars for the purpose of selecting and utilizing the services of small contractors and minority business enterprises, as such terms are defined in section 4a-60g.
(B) The commissioner shall invite contractors to submit qualifications for each specific category of services sought by the department by posting notice of such invitation on the State Contracting Portal. The notice shall be in the form determined by the commissioner, and shall set forth the information that a contractor is required to submit to be considered for selection. Upon receipt of the submittal from the contractor, the commissioner shall select, for each specified category, those contractors who (i) are determined to be the most responsible and qualified, as such terms are defined in section 4b-92, to perform the work required under the specified category, (ii) have demonstrated the skill, ability and integrity to fulfill contract obligations considering their past performance, financial responsibility and experience with projects of the size, scope and complexity required by the state under the specified category, and (iii) for projects with a cost exceeding one million dollars, have the ability to obtain the requisite bonding. The commissioner shall establish the duration that each list remains in effect, which in no event may exceed three years.
(C) For any public building or public works project involving an expense to the state of one million five hundred thousand dollars or less, the commissioner shall invite bids from only those contractors selected pursuant to subparagraphs (A) and (B) of this subdivision for the specific category of services required for the particular project. The commissioner shall determine the form of bid invitation, the manner of, and time for, submission of bids, and the conditions and requirements of such bids. The contract shall be awarded to the lowest responsible and qualified bidder, subject to the provisions of sections 4b-92 and 4b-94. In the event that fewer than three bids are received in response to an invitation to bid under this subdivision, or that all the bids are in excess of the amount of available funds for the project, the commissioner may negotiate a contract with any of the contractors submitting a bid, or reject the bids received and rebid the project in accordance with this section.
(b) The awarding authority shall determine the manner of submission and the conditions and requirements of such bids, and the time within which the bids shall be submitted, consistent with the provisions of this section and sections 4b-92 to 4b-96, inclusive. Such award shall be made not later than ninety days after the opening of such bids. If the general bidder selected as the general contractor fails to perform the general contractor's agreement to execute a contract in accordance with the terms of the general contractor's general bid and furnish a performance bond and also a labor and materials or payment bond to the amount specified in the general bid form, an award shall be made to the next lowest responsible and qualified general bidder, or, in the case of a contract awarded by the Department of Administrative Services under subdivision (5) of subsection (a) of this section, to the bidder determined in accordance with said subdivision if fewer than three bids are received. No employee of an awarding authority with decision-making authority concerning the award of a contract and no public official, as defined in section 1-79, may communicate with any bidder prior to the award of the contract if the communication results in the bidder receiving information about the contract that is not available to other bidders, except that if the lowest responsible and qualified bidder's price submitted is in excess of funds available to make an award, the awarding authority may negotiate with such bidder and award the contract on the basis of the funds available, without change in the contract specifications, plans and other requirements. If the award of a contract on such basis is refused by such bidder, the awarding authority may negotiate with other contractors who submitted bids in ascending order of bid prices without change in the contract, specifications, plans and other requirements. In the event of negotiation with general bidders as provided in this section, the general bidder involved may negotiate with subcontractors on the same basis, provided such general bidder shall negotiate only with subcontractors named on such general bidder's general bid form.
(c) No person may bid on a contract or perform work pursuant to a contract that is subject to the provisions of subsection (a) of this section unless the person is prequalified in accordance with section 4a-100.
(d) Each bid submitted for a contract described in subsection (c) of this section shall include an update statement in such form as the Commissioner of Administrative Services prescribes and, if required by the public agency soliciting such bid, a copy of the prequalification certificate issued by the Commissioner of Administrative Services. The form for such update statement shall provide space for information regarding all projects completed by the bidder since the date the bidder's prequalification certificate was issued or renewed, all projects the bidder currently has under contract, including the percentage of work on such projects not completed, the names and qualifications of the personnel who will have supervisory responsibility for the performance of the contract, any significant changes in the bidder's financial position or corporate structure since the date the certificate was issued or renewed, any change in the contractor's qualification status as determined by the provisions of subdivision (7) of subsection (c) of section 4a-100 and such other relevant information as the Commissioner of Administrative Services prescribes. Any public agency that accepts a bid submitted without a copy of such prequalification certificate, if required by such public agency soliciting such bid, and an update statement, may become ineligible for the receipt of funds related to such bid, except the public agency soliciting such bids may allow bidders no more than two business days after the opening of bids to submit a copy of the prequalification certificate, if required by such public agency, and an update statement.
(e) Any person who bids on a contract described in subsection (c) of this section shall certify under penalty of false statement at the conclusion of the bidding process that the information in the bid is true, that there has been no substantial change in the bidder's financial position or corporate structure since the bidder's most recent prequalification certificate was issued or renewed, other than those changes noted in the update statement, and that the bid was made without fraud or collusion with any person.
(f) Any person who receives information from a state employee or public official that is not available to the general public concerning any construction, reconstruction, alteration, remodeling, repair or demolition project on a public building or any other public work prior to the date that a notice for bids on the project is posted shall be disqualified from bidding on the project.
(g) Notwithstanding the provisions of this chapter regarding competitive bidding procedures, the commissioner may select and interview at least three responsible and qualified general contractors who are prequalified pursuant to section 4a-100 and submit the three selected contractors to the construction services award panels process described in section 4b-100a and any regulation adopted by the commissioner. The commissioner may negotiate with the successful bidder a contract which is both fair and reasonable to the state for a community court project, the downtown Hartford higher education center project, a correctional facility project, a juvenile residential center project, or a student residential facility for the Connecticut State University System that is a priority higher education facility project. The Commissioner of Administrative Services, prior to entering any such contract or performing any work on such project, shall submit such contract to the State Properties Review Board for review and approval or disapproval by the board, pursuant to subsection (i) of this section. Any general contractor awarded a contract pursuant to this subsection shall be subject to the same requirements concerning the furnishing of bonds as a contractor awarded a contract pursuant to subsection (b) of this section.
(h) Any agency that seeks to have a project awarded without being subject to competitive bidding procedures shall certify to the joint committee of the General Assembly having cognizance of matters relating to government administration and elections that the project is of such an emergency nature that an exception to the competitive bidding procedures of this section is required. Such certification shall include input from all affected agencies, detail the need for the exception and include any relevant documentation.
(i) In the event that the General Assembly approves legislation authorizing an exception to the competitive bidding process for a project, the State Properties Review Board shall complete a review of the contract for such project and approve or disapprove such contract no later than thirty days after the Commissioner of Administrative Services submits such contract to the board. Such review shall be conducted in accordance with the provisions of section 4b-3. In the event that such review does not occur within the thirty-day period prescribed by this subsection, such contract shall be deemed to be approved.
(j) No person whose subcontract exceeds one million dollars in value may perform work as a subcontractor on a project for the construction, reconstruction, alteration, remodeling, repair or demolition of any public building or any other public work by the state or a municipality, except a public highway or bridge project or any other construction project administered by the Department of Transportation, which project is estimated to cost more than one million dollars and is paid for, in whole or in part, with state funds, unless, at the time of the bid submission, the person is prequalified in accordance with section 4a-100. The provisions of this subsection shall not apply to the downtown Hartford higher education center project.
(k) Notwithstanding any provision of this chapter, the Commissioner of Administrative Services may purchase equipment, supplies, materials or other property or services under sections 4a-53 and 4a-66 as required to fulfill his or her responsibilities under this chapter.
(P.A. 73-528, S. 1, 12; P.A. 74-246, S. 1, 11; P.A. 75-425, S. 23, 57; P.A. 77-614, S. 73, 610; P.A. 82-438, S. 5, 6; 82-447, S. 1; P.A. 84-48, S. 12, 17; P.A. 87-496, S. 41, 110; 87-529, S. 5; P.A. 88-116, S. 4; P.A. 89-353, S. 3, 8; P.A. 92-228, S. 6, 9; P.A. 93-30, S. 4, 14; May Sp. Sess. P.A. 94-2, S. 5, 203; P.A. 95-230, S. 39, 45; P.A. 96-235, S. 14, 19; P.A. 97-293, S. 21, 26; P.A. 98-21, S. 4; 98-59, S. 2, 3; P.A. 99-26, S. 4, 39; 99-75, S. 8; 99-241, S. 50, 66; P.A. 00-192, S. 17, 102; P.A. 02-140, S. 3; P.A. 03-215, S. 1; P.A. 04-141, S. 1; P.A. 05-287, S. 10, 11; P.A. 06-134, S. 18, 19, 24; P.A. 07-202, S. 7; 07-213, S. 1; Sept. Sp. Sess. P.A. 09-7, S. 161; P.A. 11-51, S. 90; P.A. 13-247, S. 200; P.A. 14-188, S. 2, 3, 8; P.A. 16-81, S. 7–10; 16-110, S. 3; P.A. 21-104, S. 4, 5; 21-198, S. 3; P.A. 22-39, S. 5; P.A. 23-204, S. 435, 436.)
History: P.A. 74-246 required award of bid within 60 days of bid opening rather than previous 90 days and clarified procedure for negotiation of contract when bids exceed available funds and including provision for negotiations between bidders and sub-bidders; P.A. 75-425 required bidding on projects estimated to exceed $250,000 rather than $500,000 as previously; P.A. 77-614 replaced public works commissioner with commissioner of administrative services; P.A. 82-438 provided that legislative management committee is responsible for bidding procedures involving work on the state capitol building; P.A. 82-447 amended section to replace references to sub-bidders with references to subcontractors; P.A. 84-48 included any construction of or work on any building under the supervision and control of the joint committee on legislative management as being under the control of said committee where “state capitol building” was previously mentioned; P.A. 87-496 replaced administrative services commissioner with public works commissioner; P.A. 87-529 provided that a constituent unit of the state system of higher education is responsible for bidding procedures involving work on a building under the supervision of the constituent unit; P.A. 88-116 added provision re manner, conditions, requirements and time for bids; Sec. 4-137a transferred to Sec. 4b-91 in 1989; P.A. 89-353 designated existing section as Subsec. (a), exempted emergency correctional facility project from Subsec. (a) and added Subsec. (b) re procedure for award of contract for emergency correctional facility project to a general contractor; P.A. 92-228 amended Subsec. (a) by adding Subdivs. (2) and (3), exempting large public building project and construction management contracts from requirements of Subsec. (a); P.A. 93-30 made a technical change in Subsec. (a), effective July 1, 1993; May Sp. Sess. P.A. 94-2 exempted the University of Connecticut library project from Subsec. (a) and included said project in provisions of Subsec. (b), effective July 1, 1994; P.A. 95-230 amended Subsec. (a) to add exception for The University of Connecticut and made technical changes to the lettering and numbering, effective June 7, 1995; P.A. 96-235 amended Subsec. (a)(1) by repealing exemption from competitive bidding requirements for large public building projects and construction management, as defined in Sec. 4b-98, which was repealed elsewhere in the act, effective June 6, 1996; P.A. 97-293 made a technical change in Subsec. (a), effective July 1, 1997; P.A. 98-21 amended Subsec. (a) to exempt a community court project and amended Subsec. (b) to include a community court project; P.A. 98-59 changed effective date of P.A. 98-21 from October 1, 1998, to April 13, 1998; P.A. 99-26 amended Subsec. (a) to exempt the Connecticut Juvenile Training School project, amended Subsec. (b) to include said project and made technical changes, effective May 7, 1999; P.A. 99-75 substituted $500,000 for $250,000 in Subsec. (a), deleted references to “an emergency correctional facility project” and made technical changes; P.A. 99-241 added the downtown Hartford higher education center and made technical changes, effective June 28, 1999; P.A. 00-192 amended Subsecs. (a) and (b) to include correctional facility project and juvenile detention center project, effective July 1, 2000; P.A. 02-140 amended Subsecs. (a) and (b) by adding provisions re student residential facilities and made technical changes in Subsec. (b), effective July 1, 2002; P.A. 03-215 amended Subsec. (a) to reference prequalified contractors and require that advertisements indicate the prequalification and aggregate work capacity rating, designated part of Subsec. (a) as Subsec. (b), adding prohibition on communications with a bidder prior to the award of a contract and making technical changes therein, inserted new Subsec. (c) re prequalification, inserted new Subsec. (d) re update statement, inserted new Subsec. (e) re certification under penalty of false statement, inserted new Subsec. (f) re receipt of information not available to the general public and relettered former Subsec. (b) as Subsec. (g), referencing prequalification and selection by the award panel and requiring certification to legislative management committee re emergency nature of projects therein, effective October 1, 2004; P.A. 04-141 amended Subsec. (a) to delete reference to Sec. 4b-24(4), i.e. Sec. 9 of P.A. 03-215, eliminate requirement that the Commissioner of Public Works, the joint committee or the constituent unit indicate the aggregate work capacity rating required for the contract in the advertisement and delete definition of aggregate work capacity rating, amended Subsec. (b) to prohibit public official, as defined in Sec. 1-79, from communicating with any bidder prior to the award of the contract if the communication results in the bidder receiving information about the contract not available to other bidders, made technical changes in Subsec. (d), amended Subsec. (f) to include receipt of information from a state employee, made technical changes in Subsec. (g) and added requirement that the Commissioner of Public Works submit contract to the State Properties Review Board for review and approval or disapproval, designated provisions re agency seeking to have project awarded without being subject to competitive bidding procedures on and after October 1, 2004, as Subsec. (h) and amended said Subsec. to require certification for such project to the government administration and elections committee rather than the legislative management committee and made technical changes, and added Subsec. (i) re review of contract for approved project by the State Properties Review Board; P.A. 05-287 amended Subsec. (a)(1) to delete exceptions in former Subparas. (B) and (D) for the Connecticut Juvenile Training School project and The University of Connecticut library project and redesignate existing Subpara. (C) as new Subpara. (B), and existing Subparas. (E) to (G), inclusive, as new Subparas. (C) to (E), inclusive, and amended Subsec. (g) to remove The University of Connecticut library project and the Connecticut Juvenile Training School project from the list of projects for which the commissioner may negotiate a contract with the successful bidder, effective July 13, 2005; P.A. 06-134 amended Subsec. (a) to eliminate exception for certain projects undertaken and controlled by The University of Connecticut and made technical changes in both Subsec. (a) and Subsec. (c), effective January 1, 2007, and added new Subsec. (j) re requirement of certain subcontractors to be prequalified, effective October 1, 2007; P.A. 07-202 amended Subsec. (a) to include any other public work by the state and add exception for public highway or bridge projects or any other construction projects administered by Department of Transportation, amended Subsec. (c) to include work performed pursuant to a contract, amended Subsec. (d) to add provision re acceptance of bid without prequalification certificate and update bid statement, and made technical changes, effective July 10, 2007; P.A. 07-213 amended Subsec. (b) to change “within sixty days” to “not later than ninety days” re making of award, effective July 10, 2007; Sept. Sp. Sess. P.A. 09-7 amended Subsec. (a) to add references to other public work, replace requirement that invitation for bids be inserted in newspapers having circulation in each county with requirement that such invitation be posted on State Contracting Portal, add requirement that contracts be awarded to bidder that is prequalified pursuant to Sec. 4a-100 and define “public agency”, amended Subsec. (c) to make a conforming change, amended Subsec. (d) to make requirement of submitting copy of prequalification statement dependent upon discretion of the public agency, amended Subsec. (f) to add reference to any other public work and make technical changes, and amended Subsec. (j) to change October 1, 2007, to October 5, 2009, and add reference to any other public work by the state or municipality, except a public highway or bridge project or any other construction project administered by Department of Transportation, effective October 5, 2009; pursuant to P.A. 11-51, “Commissioner of Public Works” and “Department of Public Works” were changed editorially by the Revisors to “Commissioner of Construction Services” and “Department of Construction Services”, respectively, effective July 1, 2011; pursuant to P.A. 13-247, “Commissioner of Construction Services” and “Department of Construction Services” were changed editorially by the Revisors to “Commissioner of Administrative Services” and “Department of Administrative Services”, respectively, effective July 1, 2013; P.A. 14-188 amended Subsec. (a) to delete former Subdivs. (1) to (5) re exceptions, add new Subdiv. (1) re definitions, add new Subdiv. (3) re exceptions, add new Subdiv. (5) re process for Department of Administrative Services projects costing $1,500,000 or less, and make conforming and technical changes, amended Subsec. (b) to make conforming and technical changes and add references to awarding authority and to contracts awarded under Subsec. (a)(5), amended Subsec. (j) to add “at the time of the bid submission” and to make technical changes and added Subsec. (k) re purchasing authority of commissioner, effective July 1, 2014; P.A. 16-81 amended Subsec. (a)(1) to add definitions for “community court project”, “downtown Hartford higher education center project”, “correctional facility project”, “juvenile detention center project” and “priority higher education facility project” and make a technical change and amended Subsecs. (a)(3), (g) and (j) to make conforming changes, effective July 1, 2016; P.A. 16-110 amended Subsec. (a)(1) to add Subpara. (C) re building or public work under control and supervision of Military Department, effective June 3, 2016; P.A. 21-104 amended Subsecs. (a)(1), (a)(3) and (g) to replace “detention” with “residential”, effective January 1, 2022; P.A. 21-198 amended Subsecs. (d) and (e) to replace “update bid statement” with “update statement” and further amended Subsec. (d) to delete provision re invalidity of bid submitted without prequalification certificate copy or update bid statement and add exception re public agency allowing bidders 2 business days after bid opening to submit prequalification certificate copy and update statement, effective July 1, 2021; P.A. 22-39 amended Subsec. (d) to make a conforming change; P.A. 23-204 amended Subsecs. (a)(2), (4) and (5) and (j) to increase estimated cost amount for contracts from $500,000 to $1,000,000 and amended Subsec. (j) to increase estimated cost amount for subcontracts from $500,000 to $1,000,000.
(Return to Chapter Table of Contents) |
(Return to List of Chapters) |
(Return to List of Titles) |
Sec. 4b-91a. Information required of bidders for certain public works contracts. Employer participation in workforce development program. Training re state contracting. (a) As used in this section, “contract” means a contract for the construction, reconstruction, alteration, remodeling, repair or demolition of any public building or any other public work by the state or a municipality that is funded, in whole or in part, by state funds, except a public highway or bridge project or any other construction project administered by the Department of Transportation. Any bid of a contractor or substantial contractor on a contract to perform work with a value of more than five hundred thousand dollars but less than one million dollars in response to an invitation to bid issued by the Commissioner of Administrative Services, shall include the following information: (1) The bidder's form of organization; (2) the bidder's principals and key personnel and any names under which the bidder, principals or key personnel conducted business during the past five years; (3) any legal or administrative proceedings settled or concluded adversely against the bidder or any of the bidder's principals or key personnel within the past five years which relate to the procurement or performance of any public or private construction contract; (4) any legal or administrative proceedings concluded adversely against the bidder or any of the bidder's principals or key personnel within the past five years which relate to the nonpayment or underpayment of wages or benefits to the bidder's, principal's or key personnel's employees during the performance of any public or private construction contract; (5) any administrative proceedings that concluded adversely against the bidder during the past five years with the imposition of any civil penalties pursuant to section 31-69a or the issuance of any stop work orders pursuant to section 31-288; (6) a statement of whether (A) the bidder has been disqualified pursuant to section 4a-100, 4b-95, 31-57c or 31-57d, (B) the bidder is disqualified or prohibited from being awarded a contract pursuant to section 31-57b, (C) the bidder has been disqualified by another state, (D) the bidder has been disqualified by a federal agency or pursuant to federal law, (E) the bidder's registration has been suspended or revoked by the Department of Consumer Protection pursuant to section 20-341gg, (F) the bidder has been disqualified by a municipality, and (G) the matters that gave rise to any such disqualification, suspension or revocation have been eliminated or remedied; and (7) other information as the commissioner deems relevant to the determination of the bidder's qualifications and responsibilities. Any failure to disclose any of the information required under this subsection shall disqualify a contractor or substantial subcontractor from any associated bid on a contract.
(b) Any employer performing work under a contract pursuant to subsection (a) of this section shall participate in a workforce development program in which newly hired employees and existing employees are given the opportunity to develop skills. Such program may include, but need not be limited to: (1) An apprenticeship training through an apprenticeship program registered with the Labor Department or a federally recognized state apprenticeship agency that complies with the requirements of 29 CFR 29 and 29 CFR 30, as each may be amended from time to time, and (2) pre-apprenticeship training that will enable students to qualify for registered apprenticeship training.
(c) Not later than October 1, 2023, and annually thereafter, the Commissioner of Administrative Services shall hold one training session for the purpose of discussing state contracting requirements.
(P.A. 23-204, S. 437.)
(Return to Chapter Table of Contents) |
(Return to List of Chapters) |
(Return to List of Titles) |